Back Home

PNRR - National Recovery and Resilience Plan

Projects funded through Romania's National Recovery and Resilience Plan.

Construction of 0.4 MW Photovoltaic Plant

Completed

PNRR · Pilonul I · C6 Energie · I1 · PNRR2022/C6/M ENERGIE/I1

Development of new renewable energy production capacity through the construction of a 0.392 MW photovoltaic plant in Buzău Municipality. The project contributes to increasing green energy production for self-consumption (minimum 50%) and commercialization, as well as reducing CO₂ emissions by a minimum of 314.77992 tons/year.

Total Value

2.824.762,50 Lei (TVA inclus)

Non-refundable Funding

878.472,00 Lei (fără TVA)

Implementation Period

29.12.2023 – 30.09.2025

Implementation Location

Buzău Municipality, Plot 36, Parcel 675

Coordinating authority: Ministry of Investments and European Projects – NRRP

Download Press Release

Digitalization of VLADROM S.R.L.

In Progress

NRRP · C9 · Private Sector Support · SME Digitalization

Digitalization of VLADROM S.R.L. through the implementation of an integrated IT solutions package designed to optimize internal processes, improve information flow, and increase company competitiveness through the use of advanced digital technologies (ERP, IoT, AI, cloud computing, and social media).

Total Project Value

651.735,09 Lei

Non-refundable Funding (NRRP)

490.710,46 Lei

Implementation Period

11.04.2025 – 31.12.2025

Implementation Location

Unirii Blvd, No. 207, BCR Building, 2nd Floor, Buzău

Coordinating authority: Ministry of Investments and European Projects – NRRP

Download Press Release

"The content of this material does not necessarily represent the official position of the European Union or the Government of Romania"

„PNRR. Funded by the European Union – NextGenerationEU"